THE THIRD POLICEMAN
  • Home
  • Blog
  • Case Studies
  • Resume

Lean Six Sigma

Case Studies

Customer support / back office

Solving the Terminal Bottleneck: Accelerating Case Reviews via Pattern Recognition

How batch command execution and visual pattern recognition cut case review cycles from a full day to two hours.

70% reduction in review time; cleared systemic backlog growth.

Mar 2026

Mushroom cultivation

Substrate recipe standardization

Moving from improvised ratios to a repeatable, tightly controlled substrate mixing process that reduced waste and improved colonisation rates.

Reduced over-production waste by 35%, eliminated batch variability

Mar 2026

Mushroom cultivation

Humidifier tank monitoring automation

An XKC-Y26-V non-contact sensor with ESP32 and Telegram alerting provided a lightweight backup to a habit-based water level check, ensuring tank depletion was never missed.

Prevented environmental failures, reduced manual monitoring to zero, enabled remote oversight

Mar 2026

Live theatre / performance

Tech cue sheet automation for live theatre

Eliminating manual cuesheet creation through scripted automation reduced production time from hours to 60 seconds, enabling last-minute tech changes.

60-second cuesheet generation, eliminated pre-show tech chaos, enabled full tech dress rehearsals

Mar 2026

© 2026 - Adrian Doonan
  • RSS